Mineurs

Simple Mining

Buy-and-host Bitcoin miners in Iowa data centres, with in-house ASIC repair

Mineurs à vendre 5

5 en stock

ModèleDisponibilité ROIPrixVoir l'offre
En stock 1082 jours $15,000 Voir l'offre →
En stock 799 jours $8,950 Voir l'offre →
En stock 1232 jours $4,600 Voir l'offre →
En stock 1183 jours $4,350 Voir l'offre →
En stock 1095 jours $3,850 Voir l'offre →

Sites d'hébergement 10

SitesÉlectricité CapacitéCommande minimumSource d'énergieVoir l'offre
Simple Mining Site #1États-UnisThe first Simple Mining site in Iowa, grown from 50 Antminer S19 Pros to over 30 MW, with 9,000+ miners and 1.2+ EH/s. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 30 MW 1 machines grid,wind,solar,nuclear,coal,gas Voir l'offre →
Simple Mining Site #2États-UnisSimple Mining's Site #2 in Iowa: 2,500+ miners hosted, 500+ PH/s and 10+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 10 MW 1 machines grid,wind,solar,nuclear,coal,gas Voir l'offre →
Simple Mining Site #3Cedar Falls, États-UnisSimple Mining's Site #3 in Iowa: 1,400+ miners hosted, 200+ PH/s and 5+ MW at full load. Attached directly to our HQ and world class repair facility. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 5 MW 1 machines grid,wind,solar,nuclear,coal,gas Voir l'offre →
Simple Mining Site #4États-UnisSimple Mining's Site #4 in Iowa: 1,100+ miners hosted, 200+ PH/s and 5+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 5 MW 1 machines grid,wind,solar,nuclear,coal,gas Voir l'offre →
Simple Mining Site #5États-UnisSimple Mining's Site #5 in Iowa: 1,400+ miners hosted, 200+ PH/s and 5+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 5 MW 1 machines grid,wind,solar,nuclear,coal,gas Voir l'offre →
Simple Mining Site #6États-UnisSimple Mining's Site #6 in Iowa: 2,000+ miners hosted, 500+ PH/s and 7.5 MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 7.5 MW 1 machines grid,wind,solar,nuclear,coal,gas Voir l'offre →
Simple Mining Site #7États-UnisSimple Mining's Site #7 in Iowa: 1,000+ miners hosted, 150+ PH/s and 6+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 6 MW 1 machines grid,wind,solar,nuclear,coal,gas Voir l'offre →
Simple Mining Site #8États-UnisSimple Mining's Site #8 in Iowa: 10,000+ miners hosted, 1+ EH/s and 50+ MW at full load. Our first Hydro Cooled data center. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 50 MW 1 machines grid,wind,solar,nuclear,coal,gas Voir l'offre →
Simple Mining Site #9États-UnisSimple Mining's Site #9 in Iowa: 2,300+ miners hosted, 650+ PH/s and 8.5+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 8.5 MW 1 machines grid,wind,solar,nuclear,coal,gas Voir l'offre →
Simple Mining Site #10États-UnisSimple Mining's Site #10 in Iowa: 1,680 miners hosted, 800+ PH/s and 10+ MW at full load. Our second Hydro Cooled data center. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 10 MW 1 machines grid,wind,solar,nuclear,coal,gas Voir l'offre →

À propos

Simple Mining sells new Bitcoin and Scrypt ASIC miners that are installed and run in its own data centres in Iowa, USA; buyers own the hardware and pay an all-in hosting rate. It operates 10 Iowa sites with 150+ MW, a Bitmain-certified repair centre in Cedar Falls, protection plans and a marketplace where clients resell hosted miners. Prices are in US dollars, with 24-month payment plans on some models.

Avantages

Own data centres in Iowa, 150+ MW All-in hosting from USD 0.065-0.08/kWh, no minimum quantity Bitmain-certified repair centre in Cedar Falls 12 months of protection on miners bought from it 7-day free hosting trial