Madencilik cihazları

Simple Mining

Buy-and-host Bitcoin miners in Iowa data centres, with in-house ASIC repair

Satılık madenciler 5

5 stokta

ModelStok durumu ROIFiyatTeklifi gör
Stokta 1082 gün $15,000 Teklifi gör →
Stokta 799 gün $8,950 Teklifi gör →
Stokta 1232 gün $4,600 Teklifi gör →
Stokta 1183 gün $4,350 Teklifi gör →
Stokta 1095 gün $3,850 Teklifi gör →

Barındırma konumları 10

KonumlarElektrik KapasiteMinimum siparişEnerji kaynağıTeklifi gör
Simple Mining Site #1Amerika Birleşik DevletleriThe first Simple Mining site in Iowa, grown from 50 Antminer S19 Pros to over 30 MW, with 9,000+ miners and 1.2+ EH/s. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 30 MW 1 adet grid,wind,solar,nuclear,coal,gas Teklifi gör →
Simple Mining Site #2Amerika Birleşik DevletleriSimple Mining's Site #2 in Iowa: 2,500+ miners hosted, 500+ PH/s and 10+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 10 MW 1 adet grid,wind,solar,nuclear,coal,gas Teklifi gör →
Simple Mining Site #3Cedar Falls, Amerika Birleşik DevletleriSimple Mining's Site #3 in Iowa: 1,400+ miners hosted, 200+ PH/s and 5+ MW at full load. Attached directly to our HQ and world class repair facility. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 5 MW 1 adet grid,wind,solar,nuclear,coal,gas Teklifi gör →
Simple Mining Site #4Amerika Birleşik DevletleriSimple Mining's Site #4 in Iowa: 1,100+ miners hosted, 200+ PH/s and 5+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 5 MW 1 adet grid,wind,solar,nuclear,coal,gas Teklifi gör →
Simple Mining Site #5Amerika Birleşik DevletleriSimple Mining's Site #5 in Iowa: 1,400+ miners hosted, 200+ PH/s and 5+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 5 MW 1 adet grid,wind,solar,nuclear,coal,gas Teklifi gör →
Simple Mining Site #6Amerika Birleşik DevletleriSimple Mining's Site #6 in Iowa: 2,000+ miners hosted, 500+ PH/s and 7.5 MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 7.5 MW 1 adet grid,wind,solar,nuclear,coal,gas Teklifi gör →
Simple Mining Site #7Amerika Birleşik DevletleriSimple Mining's Site #7 in Iowa: 1,000+ miners hosted, 150+ PH/s and 6+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 6 MW 1 adet grid,wind,solar,nuclear,coal,gas Teklifi gör →
Simple Mining Site #8Amerika Birleşik DevletleriSimple Mining's Site #8 in Iowa: 10,000+ miners hosted, 1+ EH/s and 50+ MW at full load. Our first Hydro Cooled data center. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 50 MW 1 adet grid,wind,solar,nuclear,coal,gas Teklifi gör →
Simple Mining Site #9Amerika Birleşik DevletleriSimple Mining's Site #9 in Iowa: 2,300+ miners hosted, 650+ PH/s and 8.5+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 8.5 MW 1 adet grid,wind,solar,nuclear,coal,gas Teklifi gör →
Simple Mining Site #10Amerika Birleşik DevletleriSimple Mining's Site #10 in Iowa: 1,680 miners hosted, 800+ PH/s and 10+ MW at full load. Our second Hydro Cooled data center. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 10 MW 1 adet grid,wind,solar,nuclear,coal,gas Teklifi gör →

Hakkında

Simple Mining sells new Bitcoin and Scrypt ASIC miners that are installed and run in its own data centres in Iowa, USA; buyers own the hardware and pay an all-in hosting rate. It operates 10 Iowa sites with 150+ MW, a Bitmain-certified repair centre in Cedar Falls, protection plans and a marketplace where clients resell hosted miners. Prices are in US dollars, with 24-month payment plans on some models.

Avantajlar

Own data centres in Iowa, 150+ MW All-in hosting from USD 0.065-0.08/kWh, no minimum quantity Bitmain-certified repair centre in Cedar Falls 12 months of protection on miners bought from it 7-day free hosting trial