The Mining Shop UK
New ASIC miners, repairs and hosting from a UK team in Hartlepool
Satılık madenciler 71
67 stokta
| Model | Stok durumu | ROI | Fiyat | Teklifi gör |
|---|---|---|---|---|
| Stokta | 421 gün | $18,849 | Teklifi gör → | |
| Stokta | 422 gün | $18,424 | Teklifi gör → | |
| Ön sipariş | 303 gün | $8,088 | Teklifi gör → | |
| Ön sipariş | 637 gün | $13,355 | Teklifi gör → | |
| Stokta | 548 gün | $10,294 | Teklifi gör → | |
| Stokta | 886 gün | $13,007 | Teklifi gör → | |
| Stokta | 657 gün | $9,564 | Teklifi gör → | |
| Stokta | 1010 gün | $14,438 | Teklifi gör → | |
| Stokta | 1211 gün | $16,804 | Teklifi gör → | |
| Stokta | 627 gün | $8,197 | Teklifi gör → | |
| Stokta | 662 gün | $7,419 | Teklifi gör → | |
| Stokta | 842 gün | $9,024 | Teklifi gör → | |
| Stokta | 533 gün | $5,000 | Teklifi gör → | |
| Stokta | 666 gün | $6,256 | Teklifi gör → | |
| Stokta | 579 gün | $5,322 | Teklifi gör → | |
| Stokta | 531 gün | $4,585 | Teklifi gör → | |
| Ön sipariş | 497 gün | $3,970 | Teklifi gör → | |
| Stokta | 553 gün | $4,369 | Teklifi gör → | |
| Ön sipariş | 491 gün | $3,556 | Teklifi gör → | |
| Stokta | 582 gün | $4,077 | Teklifi gör → | |
| Stokta | 539 gün | $3,462 | Teklifi gör → | |
| Stokta | 568 gün | $3,520 | Teklifi gör → | |
| Stokta | 389 gün | $2,406 | Teklifi gör → | |
| Stokta | 1323 gün | $7,887 | Teklifi gör → | |
| Stokta | 600 gün | $3,553 | Teklifi gör → | |
| Stokta | 730 gün | $4,224 | Teklifi gör → | |
| Stokta | 389 gün | $2,246 | Teklifi gör → | |
| Stokta | 602 gün | $3,275 | Teklifi gör → | |
| Stokta | 411 gün | $2,206 | Teklifi gör → | |
| Stokta | 628 gün | $3,262 | Teklifi gör → | |
| Stokta | 850 gün | $4,412 | Teklifi gör → | |
| Stokta | 427 gün | $2,126 | Teklifi gör → | |
| Stokta | 623 gün | $3,088 | Teklifi gör → | |
| Stokta | 1300 gün | $6,283 | Teklifi gör → | |
| Stokta | 425 gün | $2,019 | Teklifi gör → | |
| Stokta | 616 gün | $2,914 | Teklifi gör → | |
| Stokta | 607 gün | $2,770 | Teklifi gör → | |
| Stokta | 547 gün | $2,446 | Teklifi gör → | |
| Stokta | 726 gün | $3,195 | Teklifi gör → | |
| Stokta | 806 gün | $3,535 | Teklifi gör → | |
| Stokta | 547 gün | $2,339 | Teklifi gör → | |
| Stokta | 587 gün | $2,460 | Teklifi gör → | |
| Stokta | 534 gün | $2,192 | Teklifi gör → | |
| Stokta | 341 gün | $1,364 | Teklifi gör → | |
| Stokta | 707 gün | $2,794 | Teklifi gör → | |
| Stokta | 691 gün | $2,714 | Teklifi gör → | |
| Stokta | 1158 gün | $4,278 | Teklifi gör → | |
| Stokta | 1136 gün | $4,010 | Teklifi gör → | |
| Stokta | 1131 gün | $3,743 | Teklifi gör → | |
| Stokta | 619 gün | $2,005 | Teklifi gör → | |
| Stokta | 992 gün | $3,208 | Teklifi gör → | |
| Stokta | 983 gün | $2,806 | Teklifi gör → | |
| Stokta | 2928 gün | $8,220 | Teklifi gör → | |
| Stokta | 765 gün | $2,146 | Teklifi gör → | |
| Stokta | 1082 gün | $2,539 | Teklifi gör → | |
| Stokta | 929 gün | $2,139 | Teklifi gör → | |
| Stokta | 941 gün | $2,112 | Teklifi gör → | |
| Stokta | 944 gün | $2,099 | Teklifi gör → | |
| Stokta | 958 gün | $1,979 | Teklifi gör → | |
| Stokta | 1379 gün | $2,152 | Teklifi gör → | |
| Stokta | 1007 gün | $1,511 | Teklifi gör → | |
| Stokta | 1489 gün | $1,805 | Teklifi gör → | |
| Stokta | 2060 gün | $1,591 | Teklifi gör → | |
| Stokta | 2317 gün | $1,564 | Teklifi gör → | |
| Stokta | 2283 gün | $1,297 | Teklifi gör → | |
| Stokta | 2868 gün | $695 | Teklifi gör → | |
| Stokta | 6251 gün | $508 | Teklifi gör → | |
| Stokta yok | 613 gün | $13,398 | Teklifi gör → | |
| Stokta yok | 730 gün | $11,678 | Teklifi gör → | |
| Stokta yok | 877 gün | $12,413 | Teklifi gör → | |
| Stokta yok | 1504 gün | $10,144 | Teklifi gör → |
Barındırma konumları 20
| Konumlar | Elektrik | Kapasite | Minimum sipariş | Enerji kaynağı | Teklifi gör |
|---|---|---|---|---|---|
YguazúYguazú, ParaguayHydro-cooled hosting at USD 0.040-0.052/kWh (excl. VAT), minimum 50 miners, install and sitting fees not published, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.040/kWh | — | 50 adet | Karma yenilenebilir | Teklifi gör → |
Addis AbabaAddis Ababa, EtiyopyaAir-cooled hosting at USD 0.045-0.058/kWh (excl. VAT), minimum 50 miners, install fee GBP 20, sitting fee GBP 20, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.045/kWh | — | 50 adet | Hidro | Teklifi gör → |
Rockdale, TexasRockdale, Amerika Birleşik DevletleriImmersion-cooled hosting at USD 0.055-0.072/kWh (excl. VAT), minimum 50 miners, install fee GBP 150, sitting fee GBP 10 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.055/kWh | — | 50 adet | grid,renewables | Teklifi gör → |
Corsicana, TexasCorsicana, Amerika Birleşik DevletleriImmersion-cooled hosting at USD 0.055-0.072/kWh (excl. VAT), minimum 50 miners, install fee GBP 150, sitting fee GBP 10 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.055/kWh | — | 50 adet | grid,renewables | Teklifi gör → |
Orla, TexasOrla, Amerika Birleşik DevletleriAir-cooled hosting at USD 0.055-0.072/kWh (excl. VAT), minimum 50 miners, install fee GBP 150, sitting fee GBP 10 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.055/kWh | — | 50 adet | grid,renewables | Teklifi gör → |
Austin, TexasAustin, Amerika Birleşik DevletleriHydro-cooled hosting at USD 0.055-0.072/kWh (excl. VAT), minimum 50 miners, install fee GBP 150, sitting fee GBP 10 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.055/kWh | — | 50 adet | grid,renewables | Teklifi gör → |
Dalton, GeorgiaDalton, Amerika Birleşik DevletleriAir-cooled hosting at USD 0.055-0.072/kWh (excl. VAT), minimum 50 miners, install fee GBP 150, sitting fee GBP 10 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.055/kWh | — | 50 adet | grid,renewables | Teklifi gör → |
Sandersville, GeorgiaSandersville, Amerika Birleşik DevletleriAir-cooled hosting at USD 0.055-0.072/kWh (excl. VAT), minimum 50 miners, install fee GBP 150, sitting fee GBP 10 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.055/kWh | — | 50 adet | grid,renewables | Teklifi gör → |
Knoxville, TennesseeKnoxville, Amerika Birleşik DevletleriAir-cooled hosting at USD 0.055-0.072/kWh (excl. VAT), minimum 50 miners, install fee GBP 150, sitting fee GBP 10 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.055/kWh | — | 50 adet | grid,renewables | Teklifi gör → |
Vicksburg, MississippiVicksburg, Amerika Birleşik DevletleriAir-cooled hosting at USD 0.055-0.072/kWh (excl. VAT), minimum 50 miners, install fee GBP 150, sitting fee GBP 10 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.055/kWh | — | 50 adet | grid,renewables | Teklifi gör → |
Cheyenne, WyomingCheyenne, Amerika Birleşik DevletleriAir-cooled hosting at USD 0.055-0.072/kWh (excl. VAT), minimum 50 miners, install fee GBP 150, sitting fee GBP 10 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.055/kWh | — | 50 adet | grid,renewables | Teklifi gör → |
Abu DhabiAbu Dhabi, Birleşik Arap EmirlikleriImmersion-cooled hosting at USD 0.065-0.085/kWh (excl. VAT), minimum 20 miners, install fee GBP 50, sitting fee GBP 50 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.065/kWh | — | 20 adet | Şebeke karışımı | Teklifi gör → |
Al AinAl Ain, Birleşik Arap EmirlikleriAir-cooled hosting at USD 0.065-0.085/kWh (excl. VAT), minimum 20 miners, install fee GBP 50, sitting fee GBP 50 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.065/kWh | — | 20 adet | Şebeke karışımı | Teklifi gör → |
DubaiDubai, Birleşik Arap EmirlikleriHydro-cooled hosting at USD 0.065-0.085/kWh (excl. VAT), minimum 20 miners, install fee GBP 50, sitting fee GBP 50 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.065/kWh | — | 20 adet | Şebeke karışımı | Teklifi gör → |
Umm Al QuwainUmm Al Quwain, Birleşik Arap EmirlikleriAir-cooled hosting at USD 0.065-0.085/kWh (excl. VAT), minimum 20 miners, install fee GBP 50, sitting fee GBP 50 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.065/kWh | — | 20 adet | Şebeke karışımı | Teklifi gör → |
Ras Al KhaimahRas Al Khaimah, Birleşik Arap EmirlikleriImmersion-cooled hosting at USD 0.065-0.085/kWh (excl. VAT), minimum 20 miners, install fee GBP 50, sitting fee GBP 50 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.065/kWh | — | 20 adet | Şebeke karışımı | Teklifi gör → |
FujairahFujairah, Birleşik Arap EmirlikleriHydro-cooled hosting at USD 0.065-0.085/kWh (excl. VAT), minimum 20 miners, install fee GBP 50, sitting fee GBP 50 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.065/kWh | — | 20 adet | Şebeke karışımı | Teklifi gör → |
FinlandFinlandiyaAir-cooled hosting at USD 0.075-0.098/kWh (excl. VAT), minimum 5 miners, install fee GBP 50, sitting fee GBP 40, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.075/kWh | — | 5 adet | grid,renewables | Teklifi gör → |
NorwayNorveçHydro-cooled hosting at USD 0.076-0.099/kWh (excl. VAT), minimum 20 miners, install fee GBP 25, sitting fee GBP 40, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.076/kWh | — | 20 adet | grid,renewables | Teklifi gör → |
United KingdomBirleşik KrallıkHydro- and immersion-cooled hosting at USD 0.120-0.156/kWh (excl. VAT), minimum 10 miners, install fee GBP 500, sitting fee GBP 50 plus infrastructure, deposit of 1 month applied to energy. Usually a 12-month term billed monthly in advance; only for new miners bought from The Mining Shop UK. |
$0.120/kWh | — | 10 adet | grid,renewables | Teklifi gör → |
Hakkında
The Mining Shop UK sells new ASIC miners from Bitmain, MicroBT, Canaan, Bitdeer, Fluminer, ElphaPex and others, plus racks, containers and multi-unit mining packages. Each unit is inspected and bench-tested in its Hartlepool lab before shipping. Prices are in GBP excluding VAT with UK delivery included; international orders ship DAP by default. It also runs a board-level repair lab and offers hosting.
Avantajlar
Every miner bench-tested in the Hartlepool lab before dispatch In-house board-level repair lab UK delivery included in the price International shipping (DAP by default, DDP on quote) Volume discounts of up to 15% from 5 units