Máy đào

Simple Mining

Buy-and-host Bitcoin miners in Iowa data centres, with in-house ASIC repair

Máy đào đang bán 5

5 còn hàng

Mẫu máyTình trạng hàng ROIGiáXem ưu đãi
Còn hàng 1082 ngày $15,000 Xem ưu đãi →
Còn hàng 799 ngày $8,950 Xem ưu đãi →
Còn hàng 1232 ngày $4,600 Xem ưu đãi →
Còn hàng 1183 ngày $4,350 Xem ưu đãi →
Còn hàng 1095 ngày $3,850 Xem ưu đãi →

Địa điểm hosting 10

Địa điểmGiá điện Công suấtĐơn tối thiểuNguồn năng lượngXem ưu đãi
Simple Mining Site #1Hoa KỳThe first Simple Mining site in Iowa, grown from 50 Antminer S19 Pros to over 30 MW, with 9,000+ miners and 1.2+ EH/s. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 30 MW 1 máy grid,wind,solar,nuclear,coal,gas Xem ưu đãi →
Simple Mining Site #2Hoa KỳSimple Mining's Site #2 in Iowa: 2,500+ miners hosted, 500+ PH/s and 10+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 10 MW 1 máy grid,wind,solar,nuclear,coal,gas Xem ưu đãi →
Simple Mining Site #3Cedar Falls, Hoa KỳSimple Mining's Site #3 in Iowa: 1,400+ miners hosted, 200+ PH/s and 5+ MW at full load. Attached directly to our HQ and world class repair facility. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 5 MW 1 máy grid,wind,solar,nuclear,coal,gas Xem ưu đãi →
Simple Mining Site #4Hoa KỳSimple Mining's Site #4 in Iowa: 1,100+ miners hosted, 200+ PH/s and 5+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 5 MW 1 máy grid,wind,solar,nuclear,coal,gas Xem ưu đãi →
Simple Mining Site #5Hoa KỳSimple Mining's Site #5 in Iowa: 1,400+ miners hosted, 200+ PH/s and 5+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 5 MW 1 máy grid,wind,solar,nuclear,coal,gas Xem ưu đãi →
Simple Mining Site #6Hoa KỳSimple Mining's Site #6 in Iowa: 2,000+ miners hosted, 500+ PH/s and 7.5 MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 7.5 MW 1 máy grid,wind,solar,nuclear,coal,gas Xem ưu đãi →
Simple Mining Site #7Hoa KỳSimple Mining's Site #7 in Iowa: 1,000+ miners hosted, 150+ PH/s and 6+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 6 MW 1 máy grid,wind,solar,nuclear,coal,gas Xem ưu đãi →
Simple Mining Site #8Hoa KỳSimple Mining's Site #8 in Iowa: 10,000+ miners hosted, 1+ EH/s and 50+ MW at full load. Our first Hydro Cooled data center. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 50 MW 1 máy grid,wind,solar,nuclear,coal,gas Xem ưu đãi →
Simple Mining Site #9Hoa KỳSimple Mining's Site #9 in Iowa: 2,300+ miners hosted, 650+ PH/s and 8.5+ MW at full load. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 8.5 MW 1 máy grid,wind,solar,nuclear,coal,gas Xem ưu đãi →
Simple Mining Site #10Hoa KỳSimple Mining's Site #10 in Iowa: 1,680 miners hosted, 800+ PH/s and 10+ MW at full load. Our second Hydro Cooled data center. All-in rate from USD 0.08/kWh (0.065-0.075 for larger loads), no minimum quantity; only miners bought from Simple Mining are hosted.
$0.080/kWh 10 MW 1 máy grid,wind,solar,nuclear,coal,gas Xem ưu đãi →

Giới thiệu

Simple Mining sells new Bitcoin and Scrypt ASIC miners that are installed and run in its own data centres in Iowa, USA; buyers own the hardware and pay an all-in hosting rate. It operates 10 Iowa sites with 150+ MW, a Bitmain-certified repair centre in Cedar Falls, protection plans and a marketplace where clients resell hosted miners. Prices are in US dollars, with 24-month payment plans on some models.

Ưu điểm

Own data centres in Iowa, 150+ MW All-in hosting from USD 0.065-0.08/kWh, no minimum quantity Bitmain-certified repair centre in Cedar Falls 12 months of protection on miners bought from it 7-day free hosting trial